Presentation on DRM harmonization process
Submitted by nirupradhan on 21 Jul, 2014Draft DRM harmonization guidelines
Submitted by nirupradhan on 21 Jul, 2014This is a draft document on DRM harmonization guideline submitted by the Technical working group to Government Policy task force.
The document is divided in five chapters covering the following aspects:
-
Chapter 1 – Introduction: This chapter covers the harmonized planning process. It explains the stakeholders responsible for each component of the process, the information to be collected and analysed and the structure of the plans to be derived.
ToR Technical working group
Submitted by nirupradhan on 21 Jul, 2014The Technical working group is responsibile to research all DRM and local government processes that may inter-relate with the CBDM framework and incorporate any lessons learnt into the final design
See the detail ToR
Outcome indicators
Submitted by nirupradhan on 10 Jul, 2014Output indicators
Submitted by nirupradhan on 10 Jul, 2014Flagship 4: Changing context of CBDRM in Nepal
Submitted by nirupradhan on 30 Jun, 2014This paper attempts to capture the progress and challenges of Flagship 4 to date (2011-2014) and makes recommendations for priority areas for Flagship 4 over the coming 2 years (2014-2015).
Flagship 4: Integrated Community Based Disaster Risk Management
Submitted by nirupradhan on 30 Jun, 2014Watch this documentary to learn about Flagship 4 : Integrated Community Based Disaster Risk Management.
Nepals urban risk and vulnerabilities
Submitted by nirupradhan on 18 Jun, 2014Flagship 4 2014-2015 outcome statements
Submitted by nirupradhan on 6 May, 2014
2014-2015 FLAGSHIP 4 OUTCOME STATEMENTS
Outcome 1
All CBDRM work being undertaken in Nepal is to the agreed standard of the 9 minimum characteristics of a disaster resilient community and are mapped online.